{"id":1962,"date":"2026-08-27T16:00:00","date_gmt":"2026-08-27T16:00:00","guid":{"rendered":"https:\/\/hscodematch.com\/news\/united-states-of-america-expands-5g-wireless-and-satellite-services\/"},"modified":"2026-09-14T06:29:56","modified_gmt":"2026-09-14T06:29:56","slug":"united-states-of-america-expands-5g-wireless-and-satellite-services","status":"publish","type":"post","link":"https:\/\/hscodematch.com\/news\/united-states-of-america-expands-5g-wireless-and-satellite-services\/","title":{"rendered":"United States of America Expands 5G Wireless and Satellite Services Spectrum Access"},"content":{"rendered":"\n<p class=\"wp-block-paragraph hsn-lede\">United States of America is expanding flexible use of the 3.7 to 4.2 GHz upper C-band spectrum to enhance spectrum utilization for next-generation wireless services and broadband communications<\/p>\n<figure class=\"hsn-fig\">\n  <div class=\"hsn-fig__hero\">\n    <div class=\"hsn-fig__kicker\">USA &#8211; 5G WIRELESS<\/div>\n    <h3 class=\"hsn-fig__headline\">US Expands Spectrum for 5G and Satellite Services<\/h3>\n    <p class=\"hsn-fig__stand\">New wireless licensees must reimburse satellite and aviation sectors to use the upper C-band.<\/p>\n  <\/div>\n\n  <div class=\"hsn-fig__stats\">\n    <div class=\"hsn-fig__stat\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><rect x=\"7\" y=\"7\" width=\"10\" height=\"10\" rx=\"1.5\"\/><path d=\"M10 3v4M14 3v4M10 17v4M14 17v4M3 10h4M3 14h4M17 10h4M17 14h4\"\/><\/svg><\/span>\n      <span class=\"hsn-fig__num\">160 MHz<\/span>\n      <span class=\"hsn-fig__lab\">Available for flexible use<\/span>\n    <\/div>\n    <div class=\"hsn-fig__stat\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M4 20V4\"\/><path d=\"M4 20h16\"\/><rect x=\"7\" y=\"12\" width=\"3\" height=\"5\"\/><rect x=\"12\" y=\"8\" width=\"3\" height=\"9\"\/><rect x=\"17\" y=\"14\" width=\"3\" height=\"3\"\/><\/svg><\/span>\n      <span class=\"hsn-fig__num\">100 MHz<\/span>\n      <span class=\"hsn-fig__lab\">Minimum competitive bidding<\/span>\n    <\/div>\n    <div class=\"hsn-fig__stat\">\n      <h4>Spectrum allocation<\/h4>\n      <div class=\"hsn-fig__bar\">\n        <span class=\"hsn-fig__lab\">Total available<\/span>\n        <svg viewbox=\"0 0 100 10\" preserveaspectratio=\"none\" aria-hidden=\"true\">\n          <rect class=\"hsn-fig__barfill\" x=\"0\" y=\"0\" width=\"100\" height=\"10\"\/>\n        <\/svg>\n        <span class=\"hsn-fig__num\">160<\/span>\n      <\/div>\n      <div class=\"hsn-fig__bar\">\n        <span class=\"hsn-fig__lab\">Min. bidding<\/span>\n        <svg viewbox=\"0 0 100 10\" preserveaspectratio=\"none\" aria-hidden=\"true\">\n          <rect class=\"hsn-fig__barfill\" x=\"0\" y=\"0\" width=\"62.5\" height=\"10\"\/>\n        <\/svg>\n        <span class=\"hsn-fig__num\">100<\/span>\n      <\/div>\n    <\/div>\n  <\/div>\n\n  <div class=\"hsn-fig__cards\">\n    <h4>What changed<\/h4>\n    <div class=\"hsn-fig__card\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><rect x=\"3\" y=\"5\" width=\"18\" height=\"14\" rx=\"2\"\/><path d=\"M7 10h4M7 14h7\"\/><circle cx=\"16.5\" cy=\"10\" r=\"1.6\"\/><\/svg><\/span>\n      <p><strong>Competitive bidding required<\/strong> for at least 100 megahertz of spectrum in the 3.98\u20134.2 GHz band.<\/p>\n    <\/div>\n    <div class=\"hsn-fig__card\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><rect x=\"2.5\" y=\"6\" width=\"19\" height=\"12\" rx=\"2\"\/><circle cx=\"12\" cy=\"12\" r=\"2.8\"\/><path d=\"M6 12h.01M18 12h.01\"\/><\/svg><\/span>\n      <p><strong>Reimbursement mandatory<\/strong> for incumbent Fixed Satellite Service operators for migration costs.<\/p>\n    <\/div>\n    <div class=\"hsn-fig__card\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M12 3l2 7 7 2-7 2-2 7-2-7-7-2 7-2z\"\/><\/svg><\/span>\n      <p><strong>Rebates required<\/strong> for eligible aircraft owners to facilitate radio altimeter retrofits.<\/p>\n    <\/div>\n    <div class=\"hsn-fig__card\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M12 3l7.5 3v5.5c0 4.5-3 8-7.5 9.5-4.5-1.5-7.5-5-7.5-9.5V6z\"\/><path d=\"M9.2 12l2 2 3.6-3.6\"\/><\/svg><\/span>\n      <p><strong>Coexistence measures<\/strong> established to protect radio altimeters in the 4.2\u20134.4 GHz band.<\/p>\n    <\/div>\n  <\/div>\n\n  <div class=\"hsn-fig__who\">\n    <h4>Who it affects<\/h4>\n    <div class=\"hsn-fig__row\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><rect x=\"7\" y=\"7\" width=\"10\" height=\"10\" rx=\"1.5\"\/><path d=\"M10 3v4M14 3v4M10 17v4M14 17v4M3 10h4M3 14h4M17 10h4M17 14h4\"\/><\/svg><\/span>\n      <p><strong>New wireless licensees<\/strong> must pay for incumbent migration and aircraft rebates.<\/p>\n    <\/div>\n    <div class=\"hsn-fig__row\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M3.5 12h17\"\/><path d=\"M12 3.5c2.4 2.6 3.6 5.4 3.6 8.5s-1.2 5.9-3.6 8.5c-2.4-2.6-3.6-5.4-3.6-8.5S9.6 6.1 12 3.5z\"\/><\/svg><\/span>\n      <p><strong>Fixed Satellite Service operators<\/strong> are entitled to reimbursement for moving operations.<\/p>\n    <\/div>\n    <div class=\"hsn-fig__row\">\n      <span class=\"hsn-fig__icon\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M12 3l2 7 7 2-7 2-2 7-2-7-7-2 7-2z\"\/><\/svg><\/span>\n      <p><strong>Aircraft owners<\/strong> can claim rebates to help cover altimeter retrofit costs.<\/p>\n    <\/div>\n  <\/div>\n\n  <div class=\"hsn-fig__flow\">\n    <h4>What to do<\/h4>\n    <div class=\"hsn-fig__step\"><p>Participate in competitive bidding for the 3.98\u20134.2 GHz spectrum.<\/p><\/div>\n    <div class=\"hsn-fig__step\"><p>Reimburse incumbent Fixed Satellite Service operators for reasonable migration costs.<\/p><\/div>\n    <div class=\"hsn-fig__step\"><p>Provide rebates to eligible aircraft owners for altimeter compliance.<\/p><\/div>\n  <\/div>\n\n  <div class=\"hsn-fig__time\">\n    <h4>Key dates<\/h4>\n    <div class=\"hsn-fig__ev\"><strong>29 Sep 2026<\/strong> \u2014 rules effective, pending OMB review.<\/div>\n    <div class=\"hsn-fig__ev\"><strong>4 Jul 2027<\/strong> \u2014 deadline for competitive bidding.<\/div>\n  <\/div>\n\n  <figcaption>United States \u2014 5G wireless and satellite spectrum expansion<\/figcaption>\n<\/figure>\n<h2 class=\"wp-block-heading\">Summary<\/h2>\n<p class=\"wp-block-paragraph\">The question addresses the <strong>Federal Communications Commission\u2019s (FCC) regulatory framework<\/strong> for expanding flexible terrestrial wireless use in the <strong>3.7\u20134.2 GHz (C-band) spectrum<\/strong>, specifically the <strong>3.98\u20134.2 GHz (Upper C-band)<\/strong> segment.<\/p>\n<ul>\n<li><strong>Licensing &amp; Auction Procedures:<\/strong> The FCC established a unified <strong>3.7 GHz Service<\/strong> spanning 3.7\u20134.14 GHz and mandated competitive bidding for 160 MHz of Upper C-band spectrum, with a congressional deadline of <strong>4 July 2027<\/strong> for auctioning at least 100 MHz<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\" id=\"hsn-cite-1\">1<\/a><\/sup>.<\/li>\n<li><strong>Performance Benchmarks:<\/strong> Licensees must meet <strong>population coverage milestones<\/strong> (45% within 2 years, 80% within 6 years of the Transition Deadline) or face accelerated deadlines or automatic license termination<sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\" id=\"hsn-cite-2\">2<\/a><\/sup>.<\/li>\n<li><strong>Coexistence &amp; Cost Reimbursement:<\/strong> Technical rules prioritize <strong>coexistence with adjacent-band radio altimeters<\/strong>, while new licensees must reimburse <strong>Fixed Satellite Service (FSS) incumbents<\/strong> for migration costs and provide <strong>rebates to aircraft operators<\/strong> for radio altimeter retrofits<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\"><strong>Jurisdiction(s):<\/strong> United States of America<\/p>\n<p class=\"wp-block-paragraph\">**<\/p>\n<p class=\"wp-block-paragraph\">Subject matters:** Spectrum Allocation \u2014 FCC auction and licensing rules for 3.7\u20134.2 GHz band; Performance Requirements \u2014 population coverage and transition deadlines for wireless licensees; Interference Mitigation \u2014 technical rules and cost-sharing obligations to protect adjacent-band operations<\/p>\n<h2 class=\"wp-block-heading\">Regulation Analysis<\/h2>\n<p class=\"wp-block-paragraph\">The FCC\u2019s <strong>Report and Order, Order of Proposed Modification, and Order on Reconsideration (FCC 26-46)<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup> expands flexible terrestrial wireless use in the <strong>3.7\u20134.2 GHz band<\/strong>, with a focus on the <strong>3.98\u20134.2 GHz (Upper C-band)<\/strong> segment. Key provisions include a <strong>160 MHz allocation<\/strong> for terrestrial wireless, unified licensing under the <strong>3.7 GHz Service<\/strong>, and performance benchmarks tied to population coverage. The rules are effective <strong>29 September 2026<\/strong>, with corrections published in the <strong>Federal Register<\/strong> on <strong>27 August 2026<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-3\" id=\"hsn-cite-3\">3<\/a>, <a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/p>\n<h3 class=\"wp-block-heading\">1. <strong>Spectrum Allocation and Licensing<\/strong><\/h3>\n<p class=\"wp-block-paragraph\">The FCC designated <strong>160 MHz of the 3.98\u20134.2 GHz band<\/strong> for terrestrial flexible use, creating a <strong>single 3.7 GHz Service<\/strong> spanning <strong>3.7\u20134.14 GHz<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. Licenses are awarded via <strong>competitive bidding (auction)<\/strong>, with Congress mandating the auction of <strong>at least 100 MHz by 4 July 2027<\/strong> under the <strong>One Big Beautiful Bill Act<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. The FCC largely adopted <strong>Lower C-band licensing rules<\/strong> for the Upper C-band but imposed <strong>stricter performance requirements<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/p>\n<h3 class=\"wp-block-heading\">2. <strong>Performance Benchmarks and Compliance<\/strong><\/h3>\n<p class=\"wp-block-paragraph\">Licensees must meet <strong>two population coverage milestones<\/strong> to retain their licenses:<\/p>\n<ul>\n<li><strong>First Benchmark:<\/strong> Provide <strong>reliable signal coverage<\/strong> and service to <strong>\u226545% of the population<\/strong> in the license area <strong>within 2 years<\/strong> of the <strong>Transition Deadline<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a>, <a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<li><strong>Second Benchmark:<\/strong> Expand coverage to <strong>\u226580% of the population<\/strong> within <strong>6 years<\/strong> of the Transition Deadline<sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a>, <a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\"><strong>Penalties for Non-Compliance:<\/strong><\/p>\n<ul>\n<li>Failure to meet the <strong>first benchmark<\/strong> accelerates the <strong>second benchmark deadline by 1 year<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/li>\n<li>Failure to meet the <strong>second benchmark<\/strong> results in <strong>automatic license termination<\/strong> for the affected area <strong>without FCC action<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/li>\n<\/ul>\n<p class=\"wp-block-paragraph\"><strong>Correction Note:<\/strong> The <strong>Federal Register correction (27 August 2026)<\/strong> clarified the benchmark timelines, replacing erroneous references to <strong>\u00a7 27.14(x)(3)<\/strong> with <strong>\u00a7 27.14(x)(4)<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-3\">3<\/a>, <a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/p>\n<h3 class=\"wp-block-heading\">3. <strong>Technical Rules and Coexistence<\/strong><\/h3>\n<p class=\"wp-block-paragraph\">The FCC adopted <strong>Lower C-band technical rules<\/strong> for the Upper C-band, with modifications to ensure <strong>coexistence with adjacent-band radio altimeters (4.2\u20134.4 GHz)<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. Key requirements include:<\/p>\n<ul>\n<li><strong>Interference Mitigation:<\/strong> Licensees must comply with <strong>modified technical parameters<\/strong> to protect radio altimeters used in aviation<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<li><strong>Rebates for Aircraft Operators:<\/strong> New Upper C-band licensees must provide <strong>rebates<\/strong> to eligible aircraft owners\/operators to facilitate <strong>FAA-mandated radio altimeter retrofits<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<\/ul>\n<h3 class=\"wp-block-heading\">4. <strong>Cost Reimbursement and Transition Incentives<\/strong><\/h3>\n<ul>\n<li><strong>FSS Incumbent Reimbursement:<\/strong> New licensees must reimburse <strong>Fixed Satellite Service (FSS) operators<\/strong> for <strong>reasonable and necessary migration costs<\/strong> from the reconfigured Upper C-band, consistent with the FCC\u2019s <strong>Emerging Technologies precedent<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<li><strong>Transition Incentives:<\/strong> Space station operators meeting <strong>clearing obligations by specified deadlines<\/strong> receive <strong>financial incentives<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/li>\n<\/ul>\n<h3 class=\"wp-block-heading\">5. <strong>Rule Effective Dates and OMB Review<\/strong><\/h3>\n<p class=\"wp-block-paragraph\">The rules are effective <strong>29 September 2026<\/strong>, except for <strong>13 provisions<\/strong> (e.g., <strong>\u00a7 27.14(x)(3)<\/strong>, <strong>\u00a7 27.1412(b)<\/strong>) requiring <strong>OMB review under the Paperwork Reduction Act<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. These provisions will take effect upon <strong>OMB approval<\/strong>, with the FCC publishing a <strong>separate Federal Register notice<\/strong> announcing their effective date<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/p>\n<h3 class=\"wp-block-heading\"><strong>Key Requirements Summary Table<\/strong><\/h3>\n<div class=\"hsn-table\">\n<div class=\"pcrstb-wrap\"><table>\n<thead><tr><th><strong>Regulation<\/strong><\/th><th><strong>Key Requirement<\/strong><\/th><th><strong>Deadline\/Threshold<\/strong><\/th><th><strong>Authority<\/strong><\/th><\/tr><\/thead>\n<tbody>\n<tr><td><strong>3.7 GHz Service Licensing<\/strong><\/td><td>Unified licensing for 3.7\u20134.14 GHz; 160 MHz allocated for Upper C-band flexible use<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/td><td>Auction of \u2265100 MHz by <strong>4 July 2027<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/td><td>FCC (47 CFR Part 27)<\/td><\/tr>\n<tr><td><strong>First Performance Benchmark<\/strong><\/td><td>Coverage and service to <strong>\u226545% of population<\/strong> in license area<sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/td><td><strong>2 years<\/strong> post-Transition Deadline<sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/td><td>47 CFR \u00a7 27.14(x)(4)<\/td><\/tr>\n<tr><td><strong>Second Performance Benchmark<\/strong><\/td><td>Coverage and service to <strong>\u226580% of population<\/strong> in license area<sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/td><td><strong>6 years<\/strong> post-Transition Deadline<sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/td><td>47 CFR \u00a7 27.14(x)(4)<\/td><\/tr>\n<tr><td><strong>FSS Cost Reimbursement<\/strong><\/td><td>Reimburse FSS incumbents for migration costs<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/td><td>As specified in license terms<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/td><td>FCC (Emerging Technologies)<\/td><\/tr>\n<tr><td><strong>Radio Altimeter Rebates<\/strong><\/td><td>Provide rebates to aircraft operators for FAA-mandated retrofits<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/td><td>As specified in license terms<sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>.<\/td><td>FCC (47 CFR Part 27)<\/td><\/tr>\n<\/tbody>\n<\/table><\/div>\n<\/div>\n<h3 class=\"wp-block-heading\"><strong>Summary Answer<\/strong><\/h3>\n<p class=\"wp-block-paragraph\">The FCC\u2019s <strong>Upper C-Band Order (FCC 26-46)<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup> expands flexible terrestrial wireless use in the <strong>3.7\u20134.2 GHz band<\/strong>, allocating <strong>160 MHz of the 3.98\u20134.2 GHz segment<\/strong> for auction by <strong>4 July 2027<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. Licensees must meet <strong>population coverage benchmarks<\/strong> (45% within 2 years, 80% within 6 years of the Transition Deadline) or face penalties, including <strong>automatic license termination<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-2\">2<\/a><\/sup>. Technical rules prioritize <strong>coexistence with radio altimeters<\/strong>, while new licensees must <strong>reimburse FSS incumbents<\/strong> and provide <strong>rebates to aircraft operators<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. The rules are effective <strong>29 September 2026<\/strong>, with select provisions pending <strong>OMB review<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-1\">1<\/a><\/sup>. Corrections to benchmark timelines were published on <strong>27 August 2026<\/strong><sup class=\"hsn-cite\"><a href=\"#hsn-ref-3\">3<\/a>, <a href=\"#hsn-ref-2\">2<\/a><\/sup>.<\/p>\n<h2 class=\"wp-block-heading hsn-refs-title\">Sources<\/h2>\n<ol class=\"hsn-refs\">\n<li id=\"hsn-ref-1\"><a class=\"hsn-refs__back\" href=\"#hsn-cite-1\" aria-label=\"Back to reference 1 in the text\">\u21a9<\/a> <a href=\"https:\/\/docs.wto.org\/imrd\/directdoc.asp?DDFDocuments\/T\/G\/TBTN25\/USA2252A1.docx\" rel=\"noopener\" target=\"_blank\">Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to \n4.2 GHz Band<\/a> <span class=\"hsn-refs__url\">https:\/\/docs.wto.org\/imrd\/directdoc.asp?DDFDocuments\/T\/G\/TBTN25\/USA2252A1.docx<\/span><\/li>\n<li id=\"hsn-ref-2\"><a class=\"hsn-refs__back\" href=\"#hsn-cite-2\" aria-label=\"Back to reference 2 in the text\">\u21a9<\/a> <a href=\"https:\/\/members.wto.org\/crnattachments\/2026\/TBT\/USA\/26_04459_00_e.pdf\" rel=\"noopener\" target=\"_blank\">WTO TBT notification 26-04459 \u2014 United States of America<\/a> <span class=\"hsn-refs__url\">https:\/\/members.wto.org\/crnattachments\/2026\/TBT\/USA\/26_04459_00_e.pdf<\/span><\/li>\n<li id=\"hsn-ref-3\"><a class=\"hsn-refs__back\" href=\"#hsn-cite-3\" aria-label=\"Back to reference 3 in the text\">\u21a9<\/a> <a href=\"https:\/\/docs.wto.org\/imrd\/directdoc.asp?DDFDocuments\/T\/G\/TBTN25\/USA2252A1C1.docx\" rel=\"noopener\" target=\"_blank\">Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band<\/a> <span class=\"hsn-refs__url\">https:\/\/docs.wto.org\/imrd\/directdoc.asp?DDFDocuments\/T\/G\/TBTN25\/USA2252A1C1.docx<\/span><\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>United States of America is expanding flexible use of the 3.7 to 4.2 GHz upper C-band spectrum to enhance spectrum utilization for next-generation\u2026<\/p>\n","protected":false},"author":1,"featured_media":1960,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","_regnews_id":"35390","_hsn_citations":"[{\"n\":1,\"url\":\"https:\/\/docs.wto.org\/imrd\/directdoc.asp?DDFDocuments\/T\/G\/TBTN25\/USA2252A1.docx\",\"label\":\"Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to \\n4.2 GHz Band\"},{\"n\":2,\"url\":\"https:\/\/members.wto.org\/crnattachments\/2026\/TBT\/USA\/26_04459_00_e.pdf\",\"label\":\"WTO TBT notification 26-04459 \u2014 United States of America\"},{\"n\":3,\"url\":\"https:\/\/docs.wto.org\/imrd\/directdoc.asp?DDFDocuments\/T\/G\/TBTN25\/USA2252A1C1.docx\",\"label\":\"Upper C-Band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band\"}]","_hsn_no_sources":"","_hsn_content_hash":"f3a591897ebeafaa39e7d5ecb19b2ee61180034a:6629af1d7de9f55fa70931ceec94f5deea8229b8","_yoast_wpseo_focuskw":"5g wireless and satellite services","footnotes":""},"categories":[8],"tags":[20],"class_list":["post-1962","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-trade-regulation","tag-united-states-of-america"],"_links":{"self":[{"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/posts\/1962","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/comments?post=1962"}],"version-history":[{"count":1,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/posts\/1962\/revisions"}],"predecessor-version":[{"id":1964,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/posts\/1962\/revisions\/1964"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/media\/1960"}],"wp:attachment":[{"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/media?parent=1962"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/categories?post=1962"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hscodematch.com\/news\/wp-json\/wp\/v2\/tags?post=1962"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}